NATIONAL ACR AND HEAT PUMP AWARDS
  • Home
  • Book a Table
  • Enter
    • Domestic Air Source Project
    • Domestic Ground Source Project
    • ACR Project
    • Non Domestic Air Source Project
    • Non Domestic Ground Source Project
    • Air Conditioning Product
    • Refrigeration Product
    • ACR Ancillary Product
    • Heat Pump Product
    • Heat Pump Installer
    • ACR Contractor
    • Wholesaler-Distributor
    • Control Product >
      • Winners 2016
  • Gallery
    • Gallery 2017
    • Gallery - National ACR Awards 2015
    • Gallery 2016
  • Winners 2018
    • Winners 2017
  • Sponsors
  • Testimonials
  • Contact

    In-Situ Monitoring Project

    Please provide the name of the person entering the details for this category.
    Please use a valid email address
    Please provide the best number to contact you on
    Please provide the name of the company or organisation for which you are entering details for the category
    Max file size: 20MB
    Please upload a high resolution version of your logo. It makes a big difference to how we can present your organisation

    Project Details

    Max file size: 30MB
    Please upload high resolution photos or images of the project. High quality images makes a big difference
    Max file size: 20MB
    Max file size: 20MB
    Max file size: 20MB

    In the next section are questions about the project. Please provide details in each section.

    1. The Application

    Please describe the application and type of system installed. 
    Max 200 words

    2. System Output

    Please provide the system's output that was measured and monitored. If only part of the system is metered and monitored, please state which and why.
    Max 200 words

    System Input

    Please provide the system's input that was measured and monitored. If only part of the system is metered and monitored, please state which and why.

    System Performance

    Indicate how performance and efficiency of the system is determined by the above techniques, and how discrepancies in operation may be resolved.

    Please state if the metering and monitoring is undertaken by a third party or the user.

    5. Other Criteria

    Please give an overview of other criteria that are metered and/or monitored within the system
    The metering and monitoring installed may also provide additional information on the system. e.g. Run times, status of various items in the system or heat, fault finding and diagnostics.

    6. Additional Information

    What additional material have you attached to this entry?
    Max file size: 40MB
    Attach any extra documents you wish to be considered by the judges for your entry
Submit Entry

Websites

ACR Journal
Heat Pumps Today
ACR Trainee of the Year Awards
Tweets by @ACRJournal
Tweets by @HeatPumpsToday

Support

Cookies
Privacy
Terms of Use
​Terms of Sale

Company

Contact Us
​The Company
Picture
© COPYRIGHT 2016
​ALL RIGHTS RESERVED.
  • Home
  • Book a Table
  • Enter
    • Domestic Air Source Project
    • Domestic Ground Source Project
    • ACR Project
    • Non Domestic Air Source Project
    • Non Domestic Ground Source Project
    • Air Conditioning Product
    • Refrigeration Product
    • ACR Ancillary Product
    • Heat Pump Product
    • Heat Pump Installer
    • ACR Contractor
    • Wholesaler-Distributor
    • Control Product >
      • Winners 2016
  • Gallery
    • Gallery 2017
    • Gallery - National ACR Awards 2015
    • Gallery 2016
  • Winners 2018
    • Winners 2017
  • Sponsors
  • Testimonials
  • Contact
✕